الوصف
Removal of all cabinets and shelving in the upstairs conference room at 2646 Atlanta Road. Removal of the faux brick wall to replace with plywood wall for creation of the video wall. Video wall to be painted black in matte finish. Replacement or cleaning of carpet tiles upon removal of cabinets and replacement or installing floor molding consistent with molding in room. Patching and repainting of the walls after the cabinets and shelving are removed.
4 تعليقs
Smyrna, GA (تم التحقق رسميا)
تم إقراره Ashley White (مستخدم مسجل)
Hey Robert,
Is this request something you would handle?
Thanks,
Ashley
Robert Early (تم التحقق رسميا)
Ashley White (مستخدم مسجل)
Hey Robert, PD informed me yesterday that they no longer need this project.
Thanks,
Ashley