Thank you for reporting the site to the Town. We will be dispatching our inspector to the site to evaluate the sidewalk. Please allow us up to two weeks to conduct the re-inspection.
The Engineering Department originally inspected the site on 6/8/2016. We have determined that the sidewalk, and driveway apron do need to be repaired. The site has been added to our master list for repairs.
We want to further acknowledge your claim. We have our contactors working on other sites but temperatures will quickly not allow for additional sidewalks to be repaired this year. As our budget allocation allow, we hope to continue repair work in the spring, typically after April 1st when the construction season begins again. Thank you for reporting this issue.
8 Commentaires
The Mayor <small class="fwn">(Invité)</small>
Administrative Secretary (Membre officiel vérifié)
Administrative Secretary (Membre officiel vérifié)
Chad Jansen (Utilisateur inscrit)
Reconnu Staff Engineer (Membre officiel vérifié)
The Engineering Department originally inspected the site on 6/8/2016. We have determined that the sidewalk, and driveway apron do need to be repaired. The site has been added to our master list for repairs.
Chad Jansen (Utilisateur inscrit)
Staff Engineer (Membre officiel vérifié)
Clos Engineering A (Utilisateur inscrit)