Descrizione
The greenway is currently blocked in both directions east and west of the Pullen Rd/Western Blvd intersection by cathedral construction. This is a main connector between NCSU main campus and Centennial campus for walkers and cyclists.
Segnalatore
The greenway is currently blocked in both directions east and west of the Pullen Rd/Western Blvd intersection by cathedral construction. This is a main connector between NCSU main campus and Centennial campus for walkers and cyclists.
2 Commentos
City of Raleigh 6 (Ufficialità verificata)
Riconosciuto NICK (Ufficialità verificata)